Urethane Clamp Testing of Oil and Gas Containment System
Project Description
CANADA LABORATORY
Canada Contract Laboratory needed for oil & gas containment system in the thermal injection production area on product that utilizes a bonded urethane molded clamping system. To be acceptable for use on thermal wells the product needs to be able to contain production fluids at 228c for minimum of 60 minutes without the urethane clamp failing.
Project Information
Number:22-02070
Industry:Enclosures and Covers