Laboratory Test Request

Project Description

Laboratory needed for failure analysis on metal composite delamination problem During the production,Test result of adhesion is ok but after 2,3 weeks (or 1,2,3..months) later ,some of panels occur delamination problem? (Some of Project; We saw after the installation,after the fabrication ..) (Peeling test should be minimum 18 kg/25 mm)

Project Information

Number:16-01503

Industry:Metals and Alloys

This request is closed and is no longer accepting quotes. Register or Log In to receive alerts when similar requests open in the future.
Adhesives, Glues, Tapes,Composites,Manufacturing and Production,Metals and Alloys

Test Request: 21-01087

MULTIPLE PRODUCTS Advanced Materials Company needs Contract Laboratory needed for thermal conductivity testing of met... view


Test Request: 21-01045

MULTIPLE PRODUCTS Materials Laboratory needed for thermal conductivity testing of metals and alloys. view


Test Request: 17-00455

Metallurgical laboratory needed for micro structure study of differing layers of zinc on zinc-coated reinforced bars (re... view