Laboratory Test Request

Project Description

India Certification Laboratory neded for UL Certification Testing of Synchronisation time module as per the standard aUL 61010-2-201?.
Components are used in:

1. The ControlLogix backplane for Coordinated System Time (CST) and Coordinated Universal Time (UTC) conversion.
2. Inter-range Instrumentation Group, code B (IRIG-B) standards
3. Precision Time Protocol (PTP) on Ethernet and the ControlLogix backplane.
4. Network Time Protocol (NTP) on Ethernet.
5. GPS position in the form of latitude, longitude, and altitude (LLA).

Project Information

Number:16-00235

This request is closed and is no longer accepting quotes. Register or Log In to receive alerts when similar requests open in the future.
Engineering

Product Request: 25-00938

BUDGET APPROVED ($1,000-$2,000)

I'm interested in purchasing equipment in the USA and want to inquire about any... view


Test Request: 25-00937

BUDGET APPROVED ($1,000-$2,000)

I need efficacy testing for a FIFRA 25 B-exempt natural insect repellent produc... view


Test Request: 25-00936

MULTIPLE TESTING & SAMPLES

LONG TERM

We regularly have samples of products such as dried barberry, sa... view