Project Description
Physical, Mechanical Laboratory needed for reliability testing of locomotive duty pre-lube pump Start/stop tests under various thermal conditions (40 to 280 deg. F) 8000 cycles lasting 5 to 35 min.
Requires temperature control of oil, but ambient temperature can vary.
Project Information
Number:11-02374