Laboratory Service Request 10-00095

Manufacturing, Production and Synthesis


Date Submitted:

07/08/2010


Urgency:

7-14 days


Industry:

Manufacturing, Production and Synthesis


Description:

Vancouver, BC Contract Manufacturer needed to manufacture a numbing cream, we have a DIN# already. Please provide quote and minimum quantity needed.


Required Location:

Vancouver, BC