Top

Incoming Power and Energy Laboratory Test Requests

Contract Laboratory has received the following Power and Energy Laboratory Test Requests which need to be fulfilled! These Laboratory Test Requests are received from a variety of sources ranging from start-up companies to large, multinational Fortune 500 corporations, international organizations, well-respected universities and government agencies that are actively seeking Independent, Third-Party Power and Energy Laboratories to perform their Power and Energy Testing, Analysis, Assays, Product Development, Scientific Research Experiments, Inspections, Certifications, and Engineering Projects. If you are a Power and Energy laboratory that would like more information on these Power and Energy projects, please visit our registration page or call toll us free 1-855-377-6821.

Below are our 50 most recent Power and Energy laboratory test requests. Please log in to see more.

09-0874

Power and Energy

Geology laboratory needed for rock testing: Cerchar Abrasivity, Taber Abrasivity, Specific Energy, Drillability Index, Blasting Index In addition to that can you provide the following Field Testing for Insitu : 1. Rock Mass Deformation / Deformability 2. In Situ stress measurements in boreholes (Hydraulic Fracture Testing on both intact roak and existing fractures) 3. In Situ stress measurements from within deep adits (overcoring tests) 4. Pressuremeter Testing for rock and soils. 5. Rock discontinuity shear strength testing.

Closed

09-0857

Power and Energy

Analytical Chemistry Laboratory needed for testing composition of electrolyte that using in lithium battery, this electrolyte include 7 organic materials and one lithium salt,and we will need do qualitative analysis for 7 organic materials and do quantitative analysis for one of them.

Closed

09-0812

Power and Energy

USA, Asia, or EU Laboratory needed for testing the wavelength of 2940nm of Er:YAG laser system

Closed

09-0791

Power and Energy

ISO 17025 USA, Asia, or EU Materials Laboratory needed for testing 2940 nm of Er:YAG laser system.

Closed

09-0758

Power and Energy

Physics Laboratory needed for testing Er:YAG laser 4290nm.

Closed

09-0549

Power and Energy

Physical Laboratory needed to test coating to measure total solar reflectance from the coating.
address:

Closed

09-0547

Power and Energy

Spain Physical Laboratory needed for testing solar concentrator mirror designed for a parabolic trough solar concentrator

Closed

09-0364

Power and Energy

USA Materials Laboratory needed for ASTM Testing of NGL: GC C1 to C6+ and CO2, N2 of NGL at 1000 psig

Closed

09-0264

Power and Energy

Maryland or New Jersey Electrical Laboratory needed for electrical conductivity of CNT (Carbon NanoTube) infused fiber/cable. Current capacity shall be also derived.

Closed

09-0202

Power and Energy

Los Angelas Electrical Laboratory needed for table lamp testing; Shorts out when used with a CFL type lamp.

Closed

09-0192

Power and Energy

USA Analytical Chemistry, Mechancial Laboratory needed for temperature, frequency, and strain testing of 600,000 cSt silicone fluid. One sample is needed.

Closed

09-0165

Power and Energy

Texas Electrical Laboratory needed for new product testing. I am looking to test a device that is 'stand alone' and is currently being developed that will produce energy for household use. We will need to have the ability to put out multiple kilowatt loads.

Do you offer testing services that would give us feedback on:
1. Power In
2. Power Out
3. Output of electromagnetic radiation

Also, could you please supply me with a rough estimate of what it would cost and/or a pricing sheet."

Closed

09-0118

Power and Energy

JEDEC 51-2 Electrical Laboratory required for testing Thermal Resistance of Heat Sinks. The objective is to benchmark the thermal performance of our own in-house heat sinks with similar commercially available ones in terms of thermal resistance (C/W) & specific thermal resistance (C/W/g) or (C/W/volume) in natural convection at varying power levels. It would be best if the testing follows JEDEC 51-2 or equivalent commonly recognized standards for heat sinks characterisation. We would also need the testing report to certify that the results are independently obtained according to these standards.

Closed

09-0087

Power and Energy

Germany Metallurgical Laboratory required for testing physical and chemical properties of the cupro Nickle tubes.

Closed

08-2587

Power and Energy

Thailand IEC 60068-2-5 Environmental Laboratory needed to test according to IEC 60068-2-5 ( solar radiation test) for electronic meter outdoor type as follows:- test procedure A (8 h irradiation and 16 h darkness)- duration of the test: 3 cycles or 3 days. Can you test according to IEC 60068-2-5 ? If yes ,please give the test price and conditoins to me.

Closed

08-2577

Power and Energy

Midwest USA ASTM 159-83, DIN 1686-2, and 1685-1 and EN1563:1997 Mechanical/Analytical Laboratory needed for testing Gray(class 2500-3500)and Ductile irons(65-45-12) for windmill industry. Tensile (inc. yield and elongation), Brinell,Chemical Composition, Microstructures,and Charpy on ductile 400-18U LT.

Closed

08-2532

Power and Energy

Eastern Europe, China, Asia Electrical Testing Laboratory needed for 110 Kv impulse testing, Partial discharge short circuit 11 kv.

Closed

08-2448

Power and Energy

California Electrical Testing Laboratory needed for conductivity testing for a fire-retardent for power poles.

Closed

08-2303

Power and Energy

Europe Electrical laboratory needed for RoHS Testing to IEC 62321, ICP-OES test rohs

Closed

08-2300

Power and Energy

India IEC 68-2-5 Solar Radiation Testing Laboratory required to test a panel of our reflector for solar radiation severity of 360 btu/h/ft^2 and conforming to IEC 68-2-5. We can offer panel size as per your chamber size.

Closed

08-2290

Power and Energy

USA Materials Testing Laboratory needed for ASTM Weathering Testing for Operating Xenon Arc light apparatus for exposure of non-metallic materials, in this case it would textiles (weathering).

Closed

08-2274

Power and Energy

Florida Electrical Testing laboratory needed for AC current handling and frequency bandpass.

Closed

08-1973

Power and Energy

USA Materials Laboratory needed for Solar Radiation test per MIL-STD 810F, Method 505.4, Procedure I and Procedure II.

Closed

08-1970

Power and Energy

USA Physical Laboratory needed for flammability testing, IEC 60076-11 page 57, section 28 Fire Behaviour Test (special test). We need to have a 350 kVa dry Type Transformer (open core and coil) tested per these requirements.

Closed

08-1920

Power and Energy

USA Oil and Petroleum Laboratory needed for 46 Transformer oil testing, DGA and D-877, to provide Dielectric Breakdown of the oil, and DGA to provide a breakdown of the gases. We will require 2 bound copies of the results. pricing to be per unit based on 46 units. All results will be trended with previous years

Closed

08-1892

Power and Energy

China ISO certified geotechnical laboratory forvarious ASTM geotechnical testing on the rock and coal samples.



Tests include brazilian, shear strength to determine cohesion and friction angle, slake durability, triaxial compression, uniaxial compression, dry density, moisture content and atterberg limits. All the test results are required to be reported either ASTM, ISO or any internationally acceptable standard.

Closed

08-1714

Power and Energy

Metallurgical laboratory needed for analysis of scrapings from porcelan bushings which is believed to be anticorrosive chemical blown from a nearby steam pop off valve

Closed

08-1671

Power and Energy

USA Analytical Chemistry Laboratory needed for extended analysis (C1-C20) of flash gas from pressurized sample of produced water.
Extended analysis and vapor pressure of stable produced water.

Closed

08-1627

Power and Energy

Illinois Analytical Chemistry Laboratory needed for Analytical testing on Flue Gas Desulphurization slurries including sulfite, sulfate, carbonate, Calcium, Magnesium, and chlorides. Limestone reactivity is also required.

Closed

08-0772

Power and Energy

North American lab needed for electrical testing of Sandwich solar panels for insulation "R" values. Will supply 2 insulated sandwich panels and require testing to compare.

Closed

08-0539

Power and Energy

Analytical Chemistry Lab needed for determination of properties of phosphoric acid at ~160C. Properties of interest include viscosity, others.

Closed

08-0500

Power and Energy

Analytical Chemistry Laboratory needed for Chemical analysis and thermal analysis:
- Nitrate content;
- Chloride content;
- Nitrite content;
- Carbonate content;
- Sulphate content;
- Hydroxyl content;
- Perchlorate content;
- Magnesium content;
- Calcium content.

Thermal and physical analysis:
- Thermal Stability;
- Melting point;
- Freezing point;
- Flash point;
- Fire point;
- Autoignition point;
- Latent heat;
- Heat capacity (at the temperature range 260-550°C);
- Thermal conductivity (at the temperature range 260-550°C);
- Heat transfer coefficient (at the temperature range 260-550°C);
- Viscosity (at the temperature range 260-550°C);
- Density (at the temperature range 260-550°C);
- Vapor pressure (at the temperature range 260-550°C).

Corrosion testing:
- Stainless steels;
- Carbon steels;
- Low alloys steels.

General aspects:
- Performance after remelting;
- Reaction with water (up to 600°C);
- Reaction with TherminolVP-1TM (up to 600°C).

Closed

08-0291

Power and Energy

Electrical laboratory needed to conduct motor loaded tests of medium voltage motor drive products
 Power Paragon will provide drive in the 5000 kW to 15000 kW range for 3-phase, 3-wire, 4160 VAC motors
 Power Paragon will provide drive that operates from 0 to 120 Hz for motors with 2 to 8 poles
 Power Paragon will provide a test procedure identifying the type of testing and data collection requirements
 Power Paragon to provide startup and operating personnel for the motor drive
 Vendor to supply a medium voltage induction motor for induction drive testing
 Vendor to supply a medium voltage permanent magnet or synchronous motor
 Vendor to supply a dynamometer connected load
 Vendor dynamometer load capable of overdriving the connected load is desirable
 Vendor to provide 4160 VAC utility source to support 5000 kW to 15000 kW load
 Vendor to provide DC voltage source in the range of 2000 to 5000 VDC for 5000 kW to 15000 kW load

Closed

08-0239

Power and Energy

Electrical Mechanical laboratory needed for energy testing as a verification process. We are a small company called Gravity Energy Development SA based in Liechtenstein.

Closed

08-0238

Power and Energy

Electrical laboratory needed to test one of our underground power lines that have failed. We would like to test it for hydrocarbons to see if they were present and contributed to the failure.

Closed

08-0099

Power and Energy

Electrical laboratory needed to test for electric conductivity and electrorheological properties of fiber films that will be used for the energy storage application

Closed

07-2563

Power and Energy

Analytical Chemistry needed to test power transformer for complete oil tests and analysis

Closed

07-2530

Power and Energy

Physical laboratory needed for testing Concentrating Solar Sun Tracker.

Closed

07-2514

Power and Energy

Analytical Chemistry laboratory needed to test our design for concentrating solar tracking - how much improvement there is to the PV under the sun. Beside, we also wish to test how sharp our focusing to the PV board. I hope to get the out door practical result.

Closed

07-2472

Power and Energy

Electrical laboratory needed for energy test rating as per Australian standards

Closed

07-2303

Power and Energy

Electrical laboratory needed for dielectric breakdown test -applying 15,000 volts direct current with breakdown. The mmaterial is protective caps for electrical connectors.

Closed

07-1770

Power and Energy

Electrical Laboratory needed for inrush current test on 300KVA transformer 1700 lbs 33" x 32" x 20"

1.0 Inrush Current
1.1 Objective is to verify that the inrush current is in accordance with the specification limit
1.2 Prerequisites: none.
1.3 Test Facility:
1.4 Apply direct current to primary winding. The value of the DC current shall be equal to the crest value of the AC exciting current obtained. Gradually remove the DC current from the primary winding. The primary terminals H1-H2-H3 shall be connected to the three phase 480 volt, 60 hertz power source with the transformers secondary terminals X1-X2_X3 open-circuited. Apply rated 480 volts (+5 VAC, -5 VAC) primary voltage with provisions made to insure that the voltage is applied when the voltage wave is going through zero or minus a maximum of 15 degrees in the direction that adds to the residual flux in that phase. Oscillograms of the three primary line currents, three primary line voltages and three secondary line voltages shall be recorded. Duration shall be sufficient to record the full transient delay of inrush currents. The transformer inrush current is the RMS value of the highest pulse of current in any line based on the duration of the pulse. Record maximum inrush current and attach oscillograms and test report to the data sheet

Acceptance Criteria
Inrush current is below maximum limit specified in the data sheet

Closed

07-1603

Power and Energy

Electrical laboratory needed for validation of energy achieved testing for Self-Sustaining Energy Process

Supplies needed:

- Hydrogen (gas)
- Oxygen (gas)
- Water
- Round container with two injection ports
- Device for measuring energy

We require a lan who can test our formula
immediately and validate it for public announcement.

I have included the objective of our formula, hypothesis and our expected results. If possible, I would like to be on-site during testing and have the experiment video taped for later education & production.

We have filed a provisional patent with the U.S. Patent &
Trademark Office (# 60946313) and will require a signed (standard USPTO) NDA.

OBJECTIVE OF THE FORMULA:

Is to provide a safe and nonpolluting energy source for the
world; thereby eliminating carbon dioxide emissions from
the atmosphere.

HYPOTHESIS:

The energy of creation at the center of all known and unknown quanta is only reached through the creative structure of hydrogen and its vapors. Thus, water becomes the starter for this demonstrable leap in energy, and through the balance of its ingredients to a harmonic completion; we reach the unified field and produce a cold fusion energy source.

EXPECTED RESULTS:

If you want to access the energy generated from this experiment, you will need a port to use the energy
after the reaction has occurred. The reaction will be a clouding up and misting ofthe contents. This will take a little time, and then yu will start to see a golden tinge to the outside of the cloudy area. After this happens, the energy will start to be generated and the area will turn clear.

Closed

07-0754

Power and Energy

Environmental laboratory needed for btu content testing of paper sludge

Closed

07-0717

Power and Energy

Electrical Laboratory needed for measuring the power consumption of equipment under various operating conditions and arrangements. Provide independent verification and certification of results.

Closed

07-0554

Power and Energy

Utility Company needs physical laboratory for UL and ANSI testing of electrical meter sockets to determine whether they meet the qualifying specs as written by that utility.

Closed

07-0465

Power and Energy

Analytical Chemistry Laboratory needed for testing total sulfur and chloride analysis on solid samples as requested on our written P.O. form.

Closed

07-0414

Power and Energy

Electrical laboratory needed for testing the power consumption of applicances connected to power bar. Please advise how we can arrange such a test and how much is the fee.

Closed

06-1842

Power and Energy

Physical laboratory needed for IEC and UL Testing (IEC 61215, Flat-Plate Photovoltaic Modules and Panels and UL 1703) of solar panels

Closed

06-1594

Power and Energy

Electronics laboratory needed for Solar Radiation Testing simulation per IEC60068-2-5 procedure A,on cell phone chargers and adaptors:
8 hours at +55 degC,
16 hours at +25 deg C,
total 24hrs = 1 cycle
x 10 cycles
non operating test

Closed

05-0015

Power and Energy

Energy company needs analytical chemistry laboratory for testing sulfate, chloride, and total organic carbon. I need the sulfate and chloride tests to reach a range within 3 ppb and the TOC to be in a range less than 100 ppb.

Closed

04-0029

Power and Energy

US based GMP Lab needed to perform Bioassay for Protease activity for California biopharmaceutical company

Closed

04-0028

Power and Energy

Toxicity testing for liquid serum for EPA registration as disinfectant and surfactant. Lab in Western US State preferred.

Closed

04-0027

Power and Energy

vibrio cholera testing of mussels for food firm by GMP lab to US FDA requirements

Closed

04-0026

Power and Energy

Multinational biopharmaceutical company needs laboratory to perform the following tests in rodents:blood glucose, blood V, blood TH (TSH/T3) and Blood PTH/Ca

Closed

04-0025

Power and Energy

Large Canadian pharmaceutical firm needs a contract lab for Raw Materials Testing for Sorbitol that can test for lead and nickel using an AA or ICP instrument. The specifications of the tests are lead, [EP (2.4.10) limit NMT 0.5ppm], and nickel [EP (2.4.15) limit NMT 1ppm]

Closed

04-0024

Power and Energy

Disinfectants Effectiveness Study for very large, California based medical device firm

Closed

04-0023

Power and Energy

techniques pour l'étalonnage d'une équerre ; la viscosité ... (from firm in Casablanca)

Closed

04-0022

Power and Energy

Marine Toxin ( eg Pectenotoxin in shellfish) testing by ISO accredited lab

Closed

04-0021

Power and Energy

HPLC Purity and content of phospholipids for California pharmaceutical company

Closed

04-0020

Power and Energy

Individual Antibiotic Test in Tea for Consumer

Closed

04-0019

Power and Energy

GMP Compliant lab to perform the following: Full Monograph Testing (individual and total) for the following items:·,Magnesium Stearate·,Maltodextin·,Polyethylene Glycol·,Silicon Dioxide,·Stearic Acid·,Croscarmellose Sodium,,Dibasic Calcium Phosphate·,Lactose Monohydrate·, Specific Rotation for Ephedrine HCl·,Diphenhydramine HCl Organic Nitrogenous Bases for a pharmaceutical company

Closed

04-0018

Power and Energy

e-tests for mupirocin gram stain for leucocytes, staph and strep

Closed

04-0017

Power and Energy

GLP POLARIMETRY TESTING. LAB MUST BE IN CANADA AND MUST CONFIRM TO GLP STANDARDS

Closed

04-0016

Power and Energy

GLP Would like to analyse 3 water soluble samples (plant extract to be used as cosmetic ingredients) for their SOD and antiperoxyl activites

Closed

04-0015

Power and Energy

Looking for a lab that can certify an all-purpose cleaner for toxicity

Closed

04-0014

Power and Energy

GLP repeat dose acute toxicology studies for vaccines.

Closed

04-0013

Power and Energy

assess the androgenic activity, in a quantitative fashion, of a single steriod with the trivial name tetrahydrogestrinone(THG) in a pilot scale study. Either an aquatic organism model or rodent model would appear adequate to provide the information desired but other potential testing types will be considered such as in-vitro receptor binding studies. The study should compare the relative androgenicity of THG to a reference compound such as testosterone

Closed

04-0012

Power and Energy

Preservative efficacy test to be performed during the following year. Number of samples and products to be determined. Preferred labs in Ireland or UK

Closed

04-0011

Power and Energy

Testing of protein toxicity. GLP compliance needed.

Closed

04-0007

Power and Energy

Gas Chromatography. Chemical structure by volume of element, analysis of liquids and solids

Closed

04-0006

Power and Energy

Pyruvic acid test

Closed

04-0005

Power and Energy

Carbon & Oxygen by combustion analysis. Analysis will be performed on a metal powder. Laboratory must be GLP compliant. Prefer Lab in Canada, but not necessary)

Closed

04-0004

Power and Energy

The same microorganism has been recovered from two different sources, Need to know if they are the same strain

Closed

04-0002

Power and Energy

Quantification of crystalline Hgh

Closed

03-0036

Power and Energy

Lab. to have a Radon Test Kits tested in Ontario, Canada

Closed

03-0035

Power and Energy

chronic toxicity tests, one in sediment and one in water, for zooplankton. Also, a chronic toxicity test for a benthic invertebrate, the midge for example if available, for water

Closed

03-0034

Power and Energy

Canada Consumer Product Safety Textiles laboratory needed for DIN4102(B1) certification in Canada or near by.

Closed

03-0033

Power and Energy

Heavy metals testing and FDA extraction testing on printed & folded coupons. (USA)

Closed

03-0032

Power and Energy

USA toxicology Laboratory needed for skin irritation/sensitisation testing to ISO 10993-10 on polythene film samples. (UK)

Closed

03-0031

Power and Energy

Pharmaceutical Laboratory needed for Residual Moisture Content analysis (e.g. Karl-Fisher analysis ) on lyophilized cake. All excipients in the formulation safely handled under BL 1 conditions. Fast Turn Around Times a must. Laboratory should be in the contiguous United States.

Closed

03-0030

Power and Energy

Pharmaceutical Laboratory needed for Osmolality measurements on reconsituted lyophilized formulation. All excipients in the formulation safely handled under BL 1 conditions. Fast Turn Around Times a must. Laboratory should be in the contiguous United States.

Closed

03-0028

Power and Energy

Bioanalytical Laboratory needed for Vitamin detection on Fetal Bovine Serum. Following is a list of vitamins and detectable units:
Vitamin B-12 pg/mL
Folic Acid ng/mL
Vitamin B-6 ng/mL
Thiamin B-1 ng/mL
Niacin ug/mL
Vitamin H Biotin pg/mL
Riboflavin B2 ng/mL
Vitamin A Retinol ng/mL
Vitamin C ng/mL
A-Tocopherol ug/mL
Carotene ug/mL

Closed

03-0027

Power and Energy

ENvironmental microbiology laboratory needed for environmental mold issues

Closed

03-0025

Power and Energy

Microbiology Laboratory needed for Minimum Inhibitory concentration (MIC) determination ,using dilution method

Closed

03-0024

Power and Energy

Microbiology Laboratory needed for disinfectant efficacy testing

Closed

03-0023

Power and Energy

EPA GLP certified ENvironmental Laboratory needed that is familiar with EPA tests in LA county

Closed

03-0021

Power and Energy

ISO Toxicology laboratory needed for In-vitro Toxicology Studies: Cyto-toxicity test to ISO 10993-5

Closed

03-0020

Power and Energy

Preclinical Laboratory needed for antiviral assay on coronaviruses using our pharmaceutical product(s)

Closed

03-0018

Power and Energy

Contract Service Preclinical Laboratory to perform an IND enabling FDA GLP toxicology study

Closed

03-0017

Power and Energy

Consumer Testing for identity testing of capsules

Closed

03-0016

Power and Energy

Preclinical Contract Research Organization needed for Periodic platelet testing in rats

Closed

03-0015

Power and Energy

Clinical Contract Research Organization needed for clinical blood testing of rifampin levels in pediatric patients' blood

Closed

03-0012

Power and Energy

Microbiology Laboratory needed for microbial analysis SB 3112. The test material consisted of only the bacterial spores at a count of 55 x 107 cfu/ml. The tests were run in compliance with the following protocols: 1 USEPA FIFRA;GLP Standards 40 CFR 160 2 USEPA TSCA 40 CFR 792 3 Org. Economic Coop. and Dev. Principles of GLP, Annex 2, C(97)186 4 Japan Ministry of Ag, Forestry & Fisheries, Notification No. 59 Noshan 3850, Director-General of Agricultural Prod. Bureau, 10 Aug 84

Closed

03-0011

Power and Energy

Analytical Chemistry Laboratory needed for solvent gas chromatography testing of three solvent samples for assay analysis on GC ASAP. Product is very pure ethly lactate.

Closed

03-0010

Power and Energy

FDA Extraction Test on furnished litho printed coupon paper. Also to do heavy metals testing onfurnished litho inks

Closed

03-0009

Power and Energy

bioanalytical laboratory needed for bioanalytical testing done on a drug call serostim (hgh)

Closed

03-0007

Power and Energy

Preclinical toxicology laboratory needed for Cytotoxicity studies: MEM Elution Sample Amount: 120 cm2 or 4 grams Irritation: Intracutaneous Reactivity (ISO) (w/2 extracts) Sample Amount: 240 cm2 or 8 grams Sensitization: Magnusson-Kligman (w/2 extracts) Sample Amount 600 cm2 or 32 grams (6 samples minimum) Sensitization: Local Lymph Node Assay: Sample Amount 400 cm2 or 20 grams

Closed

03-0006

Power and Energy

Micrbiology Laboratory needed for Microbial Barrier Properties Analysis on Packaging Material

Closed

03-0005

Power and Energy

Dietary SUpplement Mfg needs FDA analytical chemistry laboratory that can extract herbs supplied by my company of up to 25 times concentration (25:1)

Closed

03-0004

Power and Energy

University needs Wisconsin Microbiology laboratory TOC (Total Organic Carbon) testing for water analysis on water samples

Closed

03-0002

Power and Energy

Microbiology Laboratory needed for Microbiology Analysis (Total Plate Count, Yeast, Mold, E. Coli, Salmonella) for 78 Raw Materials

Closed

Submit Power and Energy Testing Requests for Power and Energy testing and Power and Energy Scientific Research